Reverse auction
Contents |
[edit] Introduction
Reverse auctions occur when suppliers compete for business in an online event by submitting the lowest bid during a specific timeframe. Reverse auctions can either be open or closed/private and are forms of Dutch auctions (also known as open descending-bid auctions where an initial price is set and progressively lowered until a bidder is prepared to accept the amount offered).
The purpose of a reverse auction is to allow business owners or procurement managers to purchase construction services at the lowest price. It does not take into consideration the experience or qualifications of the bidder.
[edit] History
This form of service procurement originated in the US the 1990s as businesses began to incorporate Internet-based methods to increase the speed of their procurement processes. The approach was initially used to purchase items such as office supplies and manufacturing equipment, and services such as tech support. It was not until 2000 that reverse auctions were used construction services in the US by large retailers, pharmaceutical companies and automobile manufacturers.
Reverse auctions were introduced in the UK in the early 2000s when the Office of Government Commerce (OGC) tested it as a procurement method for negotiating contracts for products and services not specifically associated with construction. It became more popular within the government and is still used today.
[edit] Details of reverse auctions
For the project owner, the outcome of a reverse auction will depend several factors:
- Is the marketplace competitive?
- Does the bid include all of the specifics of the project?
- Have contracting firms been properly pre-screened before being permitted to participate in the auction?
- Is there an understanding of how change orders will be handled once the project begins?
Suppliers must consider the following criteria before submitting their bids:
- Will the bid allow them to deliver the results as promised without compromising issues such as safety or timeframe?
- Will the delivery of the project have a negative impact on the outcome of other projects - whether it be profit margin or reputation?
- Will the bid cover the costs of all subcontractors on the project?
- Is there a limit to how low they will bid before walking away from the project?
By treating construction projects as commodities (such as office supplies or manufacturing equipment), the reverse auction process can fail to properly consider external variables such as weather, personnel, site conditions and other so on. This method has generally not been popular within the construction industry.
[edit] Related articles on Designing Buildings Wiki
- Auction theory.
- Best value.
- Bidder.
- Computers in construction tendering.
- Dutch auction.
- Electronic auctions under the Single Procurement Document (Scotland).
- E-procurement.
- E-sourcing.
- Invitation to tender.
- Managing the procurement process.
- Open tendering.
- Procurement route.
- The benefits of e-procurement in construction.
Featured articles and news
Homes England supports Greencore Homes
42 new build affordable sustainable homes in Oxfordshire.
Zero carbon social housing: unlocking brownfield potential
Seven ZEDpod strategies for brownfield housing success.
CIOB report; a blueprint for SDGs and the built environment
Pairing the Sustainable Development Goals with projects.
Types, tests, standards and fires relating to external cladding
Brief descriptions with an extensive list of fires for review.
Latest Build UK Building Safety Regime explainer published
Key elements in one short, now updated document.
UKGBC launch the UK Climate Resilience Roadmap
First guidance of its kind on direct climate impacts for the built environment and how it can adapt.
CLC Health, Safety and Wellbeing Strategy 2025
Launched by the Minister for Industry to look at fatalities on site, improving mental health and other issues.
One of the most impressive Victorian architects. Book review.
Common Assessment Standard now with building safety
New CAS update now includes mandatory building safety questions.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.